This vignette uses the packaged [topia]$modules kit (built in TOPIA I: building the model modules) to assemble an energy-system model and run scenarios with GLPK (bundled, no external solver needed).

library(energyRt)
library(dplyr)
library(ggplot2)
have_sf <- requireNamespace("sf", quietly = TRUE)   # region maps need the sf package
set_scenarios_path(file.path(tempdir(), "topia"))
set_default_solver(solver_options$glpk)             # set once, used by every solve

Two calls run every scenario in this vignette: interpolate_model() expands the model over regions, years and timeslices; solve_scenario() writes the solver files, runs the default solver (set once above) and reads the solution. echo = FALSE keeps the solver log out of the page — drop it to watch GLPK work.

Selecting a TOPIA structure

topia$modules$electricity offers ready region layouts (R1, R3, R7, R11); each is a kit with a base repository $repo and scenario levers. Calendars, horizons and maps sit alongside. (For a custom layout or calendar, build the blocks yourself following TOPIA I: building the model.)

names(topia$modules$electricity)          # available layouts
um  <- topia$modules$electricity$R3     # the 3-region base case
cal <- topia$modules$calendars$s4_h24
hor <- topia$modules$horizons$base        # milestones 2025/2030/2040/2050

Assembling and solving the base model

mod <- newModel("TOPIA", data = um$repo, calendar = cal,
                region = um$regions, horizon = hor, discount = 0.05)
mod <- setGeoscale(mod, um$geoscale)
scen_BASE <- interpolate_model(mod, name = "BASE") |>
  solve_scenario(echo = FALSE)
getData(scen_BASE, "vObjective", merge = TRUE)$value    # total system cost, MUSD

The R3 kit wires its regions with bi-directional transmission links (TBD_ELC_*). plot_trade_map() draws that network over a map layout — pass any of topia$geoscales (here honeycomb); the 7-region kit shows six links:

plot_trade_map(um$repo, map = topia$geoscales$honeycomb)

Electricity generation by technology:

getData(scen_BASE, "vTechOut", comm = "ELC", merge = TRUE) |>
  group_by(year, tech) |> summarise(PJ = sum(value), .groups = "drop") |>
  ggplot(aes(factor(year), PJ, fill = tech)) + geom_col() +
  labs(x = "year", title = "Generation by technology (BASE)") + theme_bw()

The dispatch over a representative summer day – generation stacked by technology, storage charging below zero, demand as the line (autoplot(scenario) reads the solution via getMix(); note that getData() aggregates sub-annual values to ANNUAL by default – pass timeframe = "highest" for timeslice-level data):

autoplot(scen_BASE, "generation", timeslice = "^SUM_")

Scenarios: layering the levers

Each scenario adds a pre-built lever to the base model. The pattern is always interpolate_model(mod, name, LEVER) then solve_scenario():

scen_CO2CAP <- interpolate_model(mod, "CO2CAP", um$CO2_CAP) |>       # emissions cap
  solve_scenario(echo = FALSE)
scen_CTAX <- interpolate_model(mod, "CARBONTAX", um$CT_CO2) |>       # carbon tax
  solve_scenario(echo = FALSE)
scen_RES <- interpolate_model(mod, "RES_SHARE", um$RES_SHARE) |>     # renewable target
  solve_scenario(echo = FALSE)
scen_NUC <- interpolate_model(mod, "NO_NEW_NUC", um$NO_NEW_NUC) |>   # no new nuclear
  solve_scenario(echo = FALSE)
scen_ERET <- interpolate_model(mod, "EARLY_RET", um$EARLY_RET) |>    # early fossil retirement
  solve_scenario(echo = FALSE)

The fifth lever, EARLY_RET, puts a declining per-region ceiling on installed coal and gas capacity – the plants carry optimizeRetirement = TRUE, so the model chooses which units to close first while the constraint sets the pace. The ceiling bites hardest on gas – generation falls from 108 to 51 PJ over the horizon – and what replaces it is wind (86 -> 179 PJ) and a little biomass. Not storage: the four-hour battery stays out of every scenario in this vignette, which is a result worth reading rather than a missing feature. With a legacy gas fleet alive to 2050, unlimited LNG above the domestic cap and an export outlet for surplus, this system is never short of flexibility, so shifting energy in time earns less than building another wind farm. A battery enters only below roughly 40 USD/kWh of reservoir – about a fifth of today’s cost – and then only in 2050.

Compare the scenarios with compare_scenarios(): the overview carries every run’s objective (with differences against the baseline), the value tables flag which solved variables moved, and autoplot() draws the comparison charts. The full comparative document is one report(cmp) call away.

scl <- list(BASE = scen_BASE, CO2CAP = scen_CO2CAP,
            CARBONTAX = scen_CTAX, RES_SHARE = scen_RES,
            EARLY_RET = scen_ERET)
cmp <- compare_scenarios(scl)
cmp
autoplot(cmp, "emissions")

Total system cost (objective) by scenario, straight from the overview:

with(cmp$overview, setNames(round(objective), scenario))

(The same charts can always be hand-rolled from the tidy layer – getData(scl, ...) and getMix(scl, ...) accept named scenario lists and add a scenario column.)

A carbon tax and a CO2 cap both cut emissions but through different mechanisms (price vs quantity); a renewable target raises cost and can even raise CO2 relative to a carbon price – a useful contrast for policy discussion.

Levelized cost of a process

levcost() on a solved scenario returns the ex-post levelized cost of a process: the discounted sum of its own costs (annualised investment vTechEac, fixed and variable O&M, and attributed fuel) divided by its output in that solution. Because it reads the actual results – not a mini-model – it is exact at the model’s time resolution, with no calendar caveat.

lc <- levcost(scen_BASE, name = "ENUC")      # the existing nuclear fleet
lc$levcost_npv                               # NPV levelized cost, MUSD/PJ
autoplot(lc, type = "components")            # eac / fixom / varom / supply, by year

ENUC runs on base-year capacity, so its capital is already sunk – the annualised-investment term eac is ~0 and the realized cost is fixed O&M plus fuel; a newly built plant would add its eac here. The cost per PJ also depends on how hard a plant is run: more output spreads the fixed costs, lowering the levelized cost. Priced across scenarios, ENUC’s LCOE tracks how much the existing fleet is dispatched as the policy mix changes:

sapply(scl, function(s) {
  lc <- suppressMessages(levcost(s, name = "ENUC"))
  if (inherits(lc, "levcost")) round(as.numeric(lc$levcost_npv), 2) else NA_real_
})

(levcost(scen, name) attributes fuel from vTechInp, so it works for the single-fuel technologies here; a plant with a grouped fuel input would need its group activity instead.) A full technology datasheet with the ex-post cost embedded is one call away (report() renders HTML/PDF; needs pandoc):

report(scen_BASE, name = "ENUC", format = "html")

# the whole-scenario results report: run provenance (scenario_runs()),
# solution checks, generation/capacity charts, and a role-driven cost
# breakdown; `run =` reports any recorded run, not only the active one
report(scen_BASE)

Other structures

The same code runs on a different layout – e.g. the single-region R1 or the larger R7 / R11 (heavier). Just swap the kit:

um7 <- topia$modules$electricity$R7
mod7 <- newModel("TOPIA7", data = um7$repo, calendar = cal,
                 region = um7$regions, horizon = hor, discount = 0.05)
mod7 <- setGeoscale(mod7, um7$geoscale)
scen7 <- interpolate_model(mod7, "BASE7") |>
  solve_scenario(echo = FALSE)

Next steps

Extend TOPIA with inter-regional trade (using the topia$geoscales layouts), technologies introduced via scenarios (CCS, hydrogen, CHP), and the honeycomb multi-region layout. See the workshop exercises for a step-by-step build.